We spent the day building Pin Boards...
Started the day at our local lumber store, choosing only the straight boards, then ripped them all down into 2" and 3" width boards for the frames. By lunchtime we had 30 frames built and ready for the cork layer and frame supports. By 3:00 we were gluing the fabric down and letting them sit overnight to dry. In the morning we will staple the fabric around the edges and get them shipped out - then do it all over again...